How long do Fusion orders take?
Notes: 1. Lead time is defined as the time from order confirmation and dispatch to the customer.
2. PCB production takes 3 - 14 business days depending on specific order parameters, not including delays caused by problems with the order/files.
3. We strongly advise customers to place orders well in advance of deadlines in case of any unforeseen delays caused by problems with the order/files.
Product |
Production Time |
Fusion PCB |
3-14 business days |
Advanced PCB |
7-15 business days |
Fusion PCBA |
7-25 business days |
PCB Stencil Service |
2-3 business days |
3D Printing |
5-7 business days |
CNC Milling |
5-7 business days |
Shipping Method | Shipping Time |
DHL | 1-3 business days |
FedEx | 4-8 business days |
EMS | 7-15 business days |
EU Post (US/GB/DE/AU Post) | 12-20 business days |
Registered Airmail - Small Parcel (Singapore Post, etc.) | 15-30 business days |
HK Local | 5-10 business days |
SF (China Only) | 2-5 business days |
Note:
1. All the packages (excluding express DHL service) take 1-3 business days for customs clearance normally, which means the postal service has not yet received the package and logistics information has not yet been updated to the website. Please track again after 3 business days.
2. Some postal services (such as USPS) can only track the parcel once it has arrived in your country.
3. For Air Mail Service, there is no quality guarantee, tracking information may be slow to update or cease completely and delivery is much slower. It usually takes 20-30 days to reach the destination. Please check at your local post office directly if you have not received your parcel more than 30 business days.
Related Articles
How long do Fusion PCB/PCBA orders take?
PCB: The lead time for PCB orders is around 6 - 17 business days. Please see below for details. PCB in production: Your PCB is being manufactured at the factory (3 - 14 business days, see note 2). PCB Arrive at Seeed Warehouse: PCB has been arrived ...
How long does it take for orders to get sent?
Items that are in stock are shipped in 1 to 3 business days. Please refer processing time in Seeed. Items that are unavailable will be placed on back order, and the remainder of your order will be shipped as partial shipments. Please check our web ...
Fusion PCBA Specification
日本語版 PCB Assembly Order Flow Chart The lead time for PCB Assembly orders is around 7-15 business days if all the parts are from the Seeed's OPL and around 20-25 business days if not. Fusion PCBA Specification Fusion PCBA Specification Order Quantity ...
What is the Lead Time for Seeed Fusion PCB Assembly orders?
Lead time is defined as the time from order confirmation to dispatch from the warehouse. It consists of the PCBA production time + warehouse packing time. Average production time for PCBA orders using externally sourced parts: Production time (20 ...
How do I prepare the Bill of Materials (BOM) file for Seeed Fusion PCBA Orders?
For Seeed PCBA orders, the Bill of Materials or BOM file should follow our template (you can download a template here). Otherwise, the system may not be able to read the file or may miss vital information. Accepted file formats: .xls, .xlsx or .csv ...